Saturday 25 September 2021

Tara - Closed for refurbishment

OUR FACILITY

Western Downs Regional Council is delivering a revitalisation of the Tara Pool.

The project will replace the existing pool which is in an extremely poor condition, and enhance a range of pool features and amenities.

The revamp will support a range of uses including Learn to Swim, squad training, representative meets, and recreational swimming.

Key Features:

  • brand new 25 metre pool with eight wider swim lanes
  • disability ramp and lane
  • heating
  • solar blankets to maintain water temperature
  • sunshade sails
  • state of the art filtration systems
  • new kiosk and amenities

Project Status:  Underway - Design Phase

Stage Outlines:
A detailed design is now being developed for the project.

Project Start Date:

Demolition and construction is expected to commence in late 2021.

Targeted Completion Date:

Completion is anticipated by the 2022/23 swim season.

 

 

 

 

 

 

 

POOL FACILITIES

  • 6 Lane 50m pool
  • Learn to Swim Program
  • Squad Programs
  • Poolside Cafe
  • Disabled access facilities and change rooms

 

CLOSED

The pool is currently closed.

CONTACT DETAILS

Smallacombe Street
Tara
Queensland
4421
 
Ph: 07 4665 3151